Construction & Demolition Waste Facility Engineering · Design & engineering phase
C&D Waste Recycling Facility
North St Marys, NSW · Construction & Demolition (C&D) Waste Recycling
Vastum Engineering has been engaged to deliver the structural engineering design, steel detailing, fabrication management and installation support for a major Construction & Demolition waste recycling facility at North St Marys, NSW. The project involves the expansion and upgrade of an existing industrial facility into a modern waste management and resource recovery hub capable of processing mixed construction and demolition waste streams.
The development includes a substantial warehouse extension, waste processing infrastructure, loading and unloading areas, storage bays, office and amenities facilities, weighbridge integration, and supporting civil infrastructure required for efficient waste recovery operations.
Vastum Engineering scope
- Structural engineering design
- Detailed structural steel design
- Structural steel shop detailing
- Steel fabrication coordination and management
- Installation and construction support
- Engineering design certification
- Warehouse extension engineering
- Waste processing infrastructure design
- Heavy-duty industrial structure design
- Coordination with project consultants and contractors
Facility features
- New industrial warehouse extension
- Waste receival and processing areas
- Mixed waste storage zones
- Mulch and recovered product storage bays
- Truck loading and unloading areas
- Dedicated quarantine area
- Shredder and processing equipment zones
- Office and staff amenities facilities
- Weighbridge infrastructure
- Internal material handling and traffic management systems
- Stormwater and drainage infrastructure upgrades
Engineering approach
- Accommodating heavy vehicle movements and operational loads
- Supporting waste processing equipment and conveyors
- Providing durable structures suited to aggressive industrial environments
- Maximising operational efficiency and material throughput
- Ensuring compliance with Australian Standards and regulatory requirements
- Designing for future growth and facility expansion
- Enhancing workplace safety and environmental performance
Project outcomes
Once complete, the upgraded North St Marys facility will provide increased waste processing capacity, improved resource recovery performance and enhanced operational efficiency — supporting the diversion of construction and demolition materials from landfill and creating a modern, scalable recycling operation for Western Sydney.